Título: | BEHAVIOR OF AN INSTRUMENTED SOIL NAILED EXCAVATION ON A RESIDUAL SOIL | |||||||
Autor: |
ALEXANDRE REIS SARE |
|||||||
Colaborador(es): |
ALBERTO DE SAMPAIO FERRAZ JARDIM SAYAO - Orientador ANNA LAURA LOPES DA SILVA NUNES - Coorientador |
|||||||
Catalogação: | 27/MAI/2008 | Língua(s): | PORTUGUESE - BRAZIL |
|||||
Tipo: | TEXT | Subtipo: | THESIS | |||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
|||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=11686&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=11686&idi=2 |
|||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.11686 | |||||||
Resumo: | ||||||||
Soil Nailing is a technique where the slope stability is
gotten through traction resistant elements (nails). This
research shows the characterization,instrumentation and
monitoring of a high wall soil nailed excavation in Niterói
(RIO DE JANEIRO). The slope heights more than 30m and the
soil was characterized as residual gneiss. The geotechnical
caracterization was divided into field and laboratory
phases. The field data used was SPT test, geotechnical
mapping and pull-out tests. The laboratory tests were
selected to inquiry parameters to evaluate the behavior of
a soil nailed wall. The designed instrumentation was
composed of tell tales, inclinometers and nails with strain
gauges. The comparative analyses show that the results
obtaneid through tell tales are similar to those obtanied
by the inclinometers. The instrumented nails had allowed to
monitoring the development of loads during the soil
excavation. Additionally, numerical simulations had been
carried out to evaluate the safety factor during the
excavation, and to predict displacements and loads in the
nails with an error around 25%. The knowledge of the
behavior of soil nailed excavation is essential for the
desing and improvement of this technique.
|
||||||||