[pt] RECALQUES DO DEPÓSITO DE SOLOS MOLES DE CAMBOINHAS, RJ
Título
[en] SETTLEMENTS OF THE SOFT SOILS DEPOSIT CAMBOINHAS, RJ
Autor
[pt] FERNANDO DUARTE AZEVEDO
Vocabulário
[pt] ENSAIO DE LABORATORIO
Vocabulário
[pt] COMPRESSAO SECUNDARIA
Vocabulário
[pt] ENSAIOS DE CAMPO
Vocabulário
[pt] SOLOS MOLES
Vocabulário
[pt] MONITORAMENTO DE RECALQUES
Vocabulário
[en] GEOTECHNICAL LABORATORY TEST
Vocabulário
[en] FIELD TEST
Vocabulário
[en] SOFT SOILS
Resumo
[pt] O acompanhamento dos recalques de aterros, por meio de nivelamento topográfico
periódico, permite estimar a evolução dos mesmos, bem como retroanalisar
os parâmetros adotados em determinado projeto. Neste trabalho, recalques
foram medidos em um aterro experimental sobre um depósito com 12 m de espessura
de solos moles em Camboinhas, Niteroi (RJ), construído entre o final de
1977 e o início de 1978. O aterro serviu como modelo em escala real para a realização
de estudos geotécnicos diversos na PUC-Rio, auxiliando o projeto de um
empreendimento imobiliário da época. A obra foi embargada pouco tempo após
seu início e, desde então, nenhum empreendimento foi realizado. Em 2013, novas
amostras Shelby foram extraídas, para a realização dos ensaios de laboratório desta
pesquisa. Ensaios de campo também foram realizados. Verificou-se que os recalques
causados pela construção do aterro ainda estão ocorrendo, 37 anos após
sua execução. Compararam-se, também, os valores de OCR de laboratório com os
obtidos por meio de correlações empíricas com os resultados de campo. Por fim,
foram feitas previsões da evolução do recalque médio com o tempo e da magnitude
do valor total médio.
Resumo
[en] Monitoring of embankment settlements using periodic topographic leveling
allows one to preview their evolution, and to assess the parameters used in a
specific design. In this research, settlements of an experimental embankment
constructed between the end of 1977 and the beginning of 1978, over a 12 m thick
soft soils deposit in Camboinhas, Niteroi (RJ), were monitored. At that time, the
embankment served as large model to help designing of a commercial housing
development. The work was hampered shortly after the end of embankment s
construction and, since then, no enterprise was held. In 2013, in this research, new
Shelby samples were obtained in order to carry out series of laboratory tests.
Settlements due to the embankment construction were noted to be still
progressing. Also, OCR values from laboratory tests were compared to those
empirically evaluated from field results. Finally, the magnitude of total settlement
and its progress with time were estimated.
Orientador(es)
ALBERTO DE SAMPAIO FERRAZ JARDIM SAYAO
Coorientador(es)
SANDRO SALVADOR SANDRONI
Banca
ALBERTO DE SAMPAIO FERRAZ JARDIM SAYAO
Banca
JOSE TAVARES ARARUNA JUNIOR
Banca
ROBERTO FRANCISCO DE AZEVEDO
Banca
SANDRO SALVADOR SANDRONI
Banca
EDGAR ODEBRECHT
Catalogação
2015-10-28
Apresentação
2015-03-11
Tipo
[pt] TEXTO
Formato
application/pdf
Formato
application/pdf
Formato
application/pdf
Formato
application/pdf
Formato
application/pdf
Formato
application/pdf
Formato
application/pdf
Idioma(s)
PORTUGUÊS
Referência [pt]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=25351@1
Referência [en]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=25351@2
Referência DOI
https://doi.org/10.17771/PUCRio.acad.25351
Arquivos do conteúdo
CAPA, AGRADECIMENTOS, RESUMO, ABSTRACT, SUMÁRIO, LISTAS, EPÍGRAFE PDF CAPÍTULO 1 PDF CAPÍTULO 2 PDF CAPÍTULO 3 PDF CAPÍTULO 4 PDF CAPÍTULO 5 PDF REFERÊNCIAS BIBLIOGRÁFICAS, APÊNDICES PDF