Título: | STUDY OF SEEPAGE CONDITIONS THROUGH ITAIPU LEFT BANK EARTHFILL DAM | |||||||
Autor: |
PEDRO DE CARVALHO THA |
|||||||
Colaborador(es): |
TACIO MAURO PEREIRA DE CAMPOS - Orientador LUIZ ALKIMIN DE LACERDA - Coorientador |
|||||||
Catalogação: | 26/DEZ/2007 | Língua(s): | PORTUGUESE - BRAZIL |
|||||
Tipo: | TEXT | Subtipo: | THESIS | |||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
|||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=11080&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=11080&idi=2 |
|||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.11080 | |||||||
Resumo: | ||||||||
The Itaipu dam consists of a series of different
structures with a total length
of 7744m. One of these structures is the Left Bank
Earthfill Dam (LBED), whose
length is 1989m. The LBED is founded directly in the local
soil, which consists of
a residual soil of basalt. The behaviour of the earthdam
is monitored by 9 electric
piezometers, 26 standpipe piezometers, 12 water level
indicators and 6 flow
meters. The flow meters were initially designed to measure
the seepage through
the dam body. For this purpose, the dam has a system of
ditches to collect the
water from the internal filters and to lead the water
until a flow meter. However,
there is water leaving the internal filters just in a
little portion of the dam. In
addition, there was no knowledge of the origin of the
water that is measured in
the flow meters, because many alterations were made in the
operation of the
dam to drain flooded areas. The drained water was
conducted to the system of
ditches. This work aims to identify the origin of the
water measured in the flow
meters and understand the seepage through the dam and its
foundation. For this
purpose a Finite Element Method analysis for eight
instrumented sections was
performed using the SEEP/W program. In addition,
statistical correlations
between data from all instrumentation of the LBED and
rainfall were made. The
main conclusion is that most of the water measured in the
flow meters comes
from the reservoir through the foundation. And only a
little amount of the total
seepage through the foundation is measured.
|
||||||||