Título: | APPLICATION OF THE AHP METHOD FOR EVALUATION OF INDUSTRIAL PROJECTS | |||||||
Autor: |
DIVA MARTINS ROSAS E SILVA |
|||||||
Colaborador(es): |
SILVIO HAMACHER - Orientador |
|||||||
Catalogação: | 20/AGO/2007 | Língua(s): | PORTUGUESE - BRAZIL |
|||||
Tipo: | TEXT | Subtipo: | THESIS | |||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
|||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=10385&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=10385&idi=2 |
|||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.10385 | |||||||
Resumo: | ||||||||
This work presents the application of the method of the
Analytic Hierarchy
Process (AHP) as tool of support to the Management of
Industrial Projects. The
focus of this study is the expansion project of the
Alunorte industry, worldwide
leader of alumina production. The success of industrial
enterprises
implementation such as the Alunorte project depends on the
performance of the
Engineering area of the Project, which is responsible for
the conception and
coordination of the several engineering projects
integrating the global project. A
direct relation exists between the effectiveness of the
engineering contractors
(designers) and the global performance of an industrial
enterprise. Therefore, it is
primordial to guarantee and to measure the quality of
Engineering. The present
research considers an evaluation of the engineering
designers through a single
index that evaluates the essential qualifications of an
engineering project. The
AHP method provided a basis for establishing the logical
problem and generating
results on quantitative and qualitative aspects. As a
consequence, the index
developed represents a tool for decision making process of
engineering contracts
practices and quality excellence achievement. Moreover,
the analyses of a specific
case study may contribute to the management of general
industrial projects.
|
||||||||