[en] A REAL OPTION ANALYSIS OF THE LINE 4 SUBWAY CONSTRUCTION PROJECT IN SÃO PAULO

Título
[pt] AVALIAÇÃO DO PROJETO DE CONSTRUÇÃO DA LINHA 4 DO METRÔ DE SÃO PAULO PELA METODOLOGIA DE OPÇÕES REAIS

Autor
[pt] MARINA SCHUABB SALGADO

Vocabulário
[pt] OPCAO REAL

Vocabulário
[pt] TRANSPORTE PUBLICO

Vocabulário
[pt] AVALIACAO DE PROJETO

Vocabulário
[en] REAL OPTION

Vocabulário
[en] PUBLIC TRANSPORT

Vocabulário
[en] PROJECT EVALUATION

Resumo
[pt] Devido à escassez de recursos públicos nas últimas décadas, as Parcerias Público-Privadas têm sido cada vez mais utilizadas pelos governos como alternativa a investimentos de infra-estrutura de grande porte. O setor de transporte abriga excelentes oportunidades para a aplicação de tal parceria, e a correta avaliação deste tipo de projeto é de grande interesse da sociedade como um todo. A Metodologia Tradicional avalia as Parcerias Público-Privadas desconsiderando as flexibilidades deste tipo de projeto. Nesta dissertação, propõe-se a avaliação por Opções Reais, como complementação a forma tradicional de análise, introduzindo risco, incertezas e flexibilidades ao modelo clássico, como a incerteza de tráfego e garantias contratuais. Este modelo é aplicado ao Edital de Concorrência Internacional nº. 42325212, referente à concessão patrocinada para a exploração e operação da Linha 4 do Metrô de São Paulo e compara-se a avaliação pelo método de Avaliação Tradicional com o método das Opções Reais. Os resultados indicam que a Metodologia Tradicional não consegue incorporar as flexibilidades do projeto, enquanto que, a Teoria das Opções Reais os incorpora, mostrando-se mais adequada para a avaliação de tal projeto.

Resumo
[en] Due to a lack of public funding in the last decade for infrastructure projects, private capital has been encouraged by government to participate in Public Private Partnerships (PPP). Transportation sector is a good example of opportunities to such association. The correct valuation of those types of projects is in the best interest of all society, but Traditional Methods, such as discounted cash flows, do not capture the value of the flexibilities embedded in those projects. This work proposes the use of Real Options Method as a complement to Traditional Analysis, by considering risks and uncertainties and flexibilities. The model was applied to the International Public Bid nº 42325212, which relates to the construction and operation of Line 4 of São Paulo City subway. By comparing both methods, traditional and real options, this work seeks to provide best way to measure this kind of project risks. The results suggest that Traditional Method does not considerate projects flexibilities, meanwhile, Real Optional Analysis does, and signalizing that is method is more suitable for this kind of project analysis.

Orientador(es)
LUIZ EDUARDO TEIXEIRA BRANDAO

Banca
LUIZ EDUARDO TEIXEIRA BRANDAO

Banca
LEONARDO LIMA GOMES

Banca
EDUARDO CESAR GOMES SARAIVA

Catalogação
2009-12-10

Apresentação
2009-06-29

Tipo
[pt] TEXTO

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Formato
application/pdf

Idioma(s)
PORTUGUÊS

Referência [pt]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=14699@1

Referência [en]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=14699@2

Referência DOI
https://doi.org/10.17771/PUCRio.acad.14699


Arquivos do conteúdo
CAPA, AGRADECIMENTOS, RESUMO, ABSTRACT, SUMÁRIO E LISTAS PDF
CAPÍTULO 1 PDF
CAPÍTULO 2 PDF
CAPÍTULO 3 PDF
CAPÍTULO 4 PDF
CAPÍTULO 5 PDF
CAPÍTULO 6 PDF
CAPÍTULO 7 PDF
REFERÊNCIAS BIBLIOGRÁFICAS PDF