Título: SOLAR AND WIND ENERGY GENERATION WITH PUMPED HYDRO STORAGE: A SOLUTION FOR BRAZIL?
Autor(es): FILIPE PAPA DE FIGUEIREDO
Colaborador(es): FLORIAN ALAIN YANNICK PRADELLE - Orientador
Catalogação: 08/JUL/2021 Língua(s): PORTUGUESE - BRAZIL
Tipo: TEXT Subtipo: SENIOR PROJECT
Notas: [pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio.
[en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio.
Referência(s): [pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/TFCs/consultas/conteudo.php?strSecao=resultado&nrSeq=53593@1
[en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/TFCs/consultas/conteudo.php?strSecao=resultado&nrSeq=53593@2
DOI: https://doi.org/10.17771/PUCRio.acad.53593
Resumo:
Currently, the use of photovoltaics and wind energy technologies are mainly used during their daytime generation period in Micro and Mini Distributed Generation (MMGD), caused by its challenges to reduce costs and increase efficiency, which in case battery banks are usually implemented for storage. This graduation project focuses on the study of intermittent solar and wind renewable intermittent energy storage, through reverse hydraulic power plants. Through technical, economic, and environmental details, technological solutions and the advantages and disadvantages of harnessing solar and wind energy are analyzed. In addition, possible configurations of hybridization with storage are studied and Brazil s potential for the implementation of this technology are evaluated. Finally, a solar-wind-hydraulic system is designed through numerical modeling and its viability will be evaluated by energetic, exergetic, environmental and economic analyses. Thus, it was demonstrated that however simple the operation of the project, it is necessary a too complex integration configuration between the systems and too high head of the reservoirs for MMGD in Brazil, therefore obtaining low efficiency for the usage of stored energy.