Título: | RISK MEASUREMENT OF BUSINESS PROCESSES IN THE ELECTRICITY SECTOR: A STRATEGY FOR CONTINUOUS AUDITING | ||||||||||||||||||||||||||||||||||||||||
Autor: |
JOÃO BATISTA DOMINICI DA PENHA FILHO |
||||||||||||||||||||||||||||||||||||||||
Colaborador(es): |
MARIA FATIMA LUDOVICO DE ALMEIDA - Orientador MAURICIO NOGUEIRA FROTA - Coorientador |
||||||||||||||||||||||||||||||||||||||||
Catalogação: | 13/MAI/2019 | Língua(s): | PORTUGUESE - BRAZIL |
||||||||||||||||||||||||||||||||||||||
Tipo: | TEXT | Subtipo: | THESIS | ||||||||||||||||||||||||||||||||||||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
||||||||||||||||||||||||||||||||||||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=37985&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=37985&idi=2 |
||||||||||||||||||||||||||||||||||||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.37985 | ||||||||||||||||||||||||||||||||||||||||
Resumo: | |||||||||||||||||||||||||||||||||||||||||
Continuous monitoring and audit aim at improving the efficiency of operations at the company, identifying and timely assessing risks for providing critical information to senior management for better decision-making processes. By adopting control tools embedded in company s information systems or by using specialized software, continuous monitoring and audit provide real-time assessment of business processes. This dissertation aims to develop and apply in a Brazilian power energy company a methodology for establishing and hierarchizing monitoring rules for the purpose of continuous monitoring and audit. The proposed methodology encompasses selection of business processes with greater exposure to risk; identification of risk events associated with those processes; and establishment of monitoring rules themselves. This research can be classified as applied, descriptive, methodological and participatory. Its methodological approach includes the development of a case study and workshops for collecting primary data. The main results can be summarized as follows: (i) critical review of existing literature on continuous audit; (ii) a methodology designed for establishing and hierarchizing monitoring rules with the purpose of continuous monitoring and audit at a Brazilian power energy company selected for this research; and (iii) demonstration of the applicability and effectiveness of the proposed methodology according to the results presents in the case study.
|
|||||||||||||||||||||||||||||||||||||||||
|