Título: | GRAPH THEORY IN OPERATIONS OF THE HYDROTHERMAL SYSTEMS | ||||||||||||
Autor: |
EDGARDO GUILLERMO CAMACHO PALOMINO |
||||||||||||
Colaborador(es): |
LEONTINA MARIA VIANNA GRAZIADIO PINTO - Orientador |
||||||||||||
Catalogação: | 21/NOV/2005 | Língua(s): | PORTUGUESE - BRAZIL |
||||||||||
Tipo: | TEXT | Subtipo: | THESIS | ||||||||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
||||||||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=7505&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=7505&idi=2 |
||||||||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.7505 | ||||||||||||
Resumo: | |||||||||||||
The search for more efficiency in the production of
eletrical energy, has led several countries to re-
structure their eletric sectors, traditionally under
control of federal, or state governments like in England,
in /spain, in New Zeland, in argentina, in Chile, in Peru
(object of this work), and now in Brasil. In this new
structure the profit of the private enterprises ough to go
tied to the efficiency of their electric systems.
This thesis introduces an alternative form for optimal
operation planning, and for determination of dual
variables that can be used as indicators for rate-schedule
structures in hydrothermal systems based on graph theory.
The main advantage are simplicity, and efficiency: the
algorithm for optimal search in graph is 200 to 300 times
faster than the general purpose methods of linear and non-
linear optimization.
The operations model of the hydrothermal system considers
the hydraulic constraint, historical influx scenarius, and
capacity expansion projects within the study horizon.
|
|||||||||||||
|