Título: | RISK ASSESSMENT IN ELECTRIC NETWORKS CONSIDERING RENEWABLE SOURCES AND GENERATION AND TRANSMISSION CONTINGENCIES VIA PROBABILISTIC POWER FLOW | ||||||||||||
Autor: |
TOMAS DE REZENDE BELO PEREIRA |
||||||||||||
Colaborador(es): |
ARMANDO MARTINS LEITE DA SILVA - Orientador ANDRE MILHORANCE DE CASTRO - Orientador |
||||||||||||
Catalogação: | 24/NOV/2023 | Língua(s): | PORTUGUESE - BRAZIL |
||||||||||
Tipo: | TEXT | Subtipo: | THESIS | ||||||||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
||||||||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=65122&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=65122&idi=2 |
||||||||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.65122 | ||||||||||||
Resumo: | |||||||||||||
The global demand for sustainable solutions for electricity generation has grown rapidly in recent decades, driven by government tax incentives and investments in technology research and development. This caused a growing insertion of renewable sources in power networks around the world, creating new critical challenges for systems performance assessments that are enhanced by the intermittency of these energy resources combined with the failures of network equipment. Motivated by this scenario, this dissertation addresses the estimation of risk of inadequacy of electrical quantities, such as overload occurrences in electrical branches or undervoltage in buses, through the use of probabilistic power flow, based on Monte Carlo simulation and the cross-entropy method. The objective is to determine the risk of the system not meeting operational criteria, precisely and with computational efficiency, considering load, generation and transmission uncertainties. The method is applied to IEEE RTS 79 and IEEE 118 bus test systems, also considering modified versions with the inclusion of a wind power plant, and the results are widely discussed.
|
|||||||||||||
|