Título: | COSTS ALLOCATION OF REACTIVE POWER DEVICES | |||||||
Autor: |
GISELA APARECIDA SILVA N BARROS |
|||||||
Colaborador(es): |
RICARDO BERNARDO PRADA - Orientador |
|||||||
Catalogação: | 20/MAI/2003 | Língua(s): | PORTUGUESE - BRAZIL |
|||||
Tipo: | TEXT | Subtipo: | THESIS | |||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
|||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=3511&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=3511&idi=2 |
|||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.3511 | |||||||
Resumo: | ||||||||
It is important to identify the agents that take advantage
of the ancillary services for system operation in the
nowadays electricity market. The actual economic design
requires that the costs of investment, operation and
maintenance of the necessary equipment should be properly
allocated between these agents. Among the ancillary
services, the reactive power support for voltage regulation
is quite important.
It is presented a method that identifies the buses that
take advantage of the reactive power equipment and
allocates the costs between each one of them. The power
system reliability is taken into account. The analysis
considers possible contingencies and their respective
probability of occurrence. The computer program NH2,
developed by CEPEL, is the main tool for the development of
this work.
The method is based on the Lagrangian multipliers of an
optimal power flow problem (OPF) associated to corrective
measures necessary to deal with voltage violations. Two
different objective functions are used: minimum load
shedding and minimum reactive power injection. The
Lagrangian multipliers define the responsibility of each
bus when system voltage violations occur.
For the purpose of illustration, the method is applied on
the 24 bus IEEE Reliability Test System and on Área Rio
system. Results are compared with those produced by other
existing method that defines cost allocation factors
measuring the benefit due the reactive support. This
comparison, benefit x responsibility, and the theory used
by both methods, show that the proposed method identifies
more appropriately the buses and the corresponding factors
to allocate the costs.
|
||||||||