Título: | SOLID WASTE MANAGEMENT AT PUC-RIO GAVEA CAMPUS: DESIGN, IMPLEMENTATION AND OPERATIONAL CURRENT STATUS | ||||||||||||
Autor: |
PATRICIA CAROLINE GUEDES GOMES |
||||||||||||
Colaborador(es): |
JOSE TAVARES ARARUNA JUNIOR - Orientador |
||||||||||||
Catalogação: | 06/SET/2018 | Língua(s): | PORTUGUESE - BRAZIL |
||||||||||
Tipo: | TEXT | Subtipo: | THESIS | ||||||||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
||||||||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=35026&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=35026&idi=2 |
||||||||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.35026 | ||||||||||||
Resumo: | |||||||||||||
TThe Solid Waste Management Plan at PUC-Rio, on the Gávea Campus,
draws up a diagnosis of the managerial, functional and physical situation of solid
waste at the University. The objective is to determine the data which will help in
the preparation of the Waste Management Plan, in which actions are laid out for
environmental, social and financial improvements of the institution.
Once the definitions of physical and operational aspects of the Solid Waste
Management Plan are laid out on the Gávea Campus, at PUC-Rio, the
implementation of Selective Waste Collection Project will start in two places.
Considering that a Solid Waste Management Plan goes through the stages of
diagnosis, implementation, verification and revision of the management process at
the end of the project, aiming at the continuous improvement, a relative diagnosis
of the functional and operational characteristics of the project will be presented,
generating, thus, suggestions for improvements of the Management Plan.
After the diagnosis, it was possible to get a more comprehensive view of
the origin, composition and system of the Solid Waste Management produced on
the Gávea Campus at PUC-Rio. The management of the solid waste is done by the
administrative department of the Campus, at PUC-Rio, having its operational part
done by a third-party. That is, the collection, sweeping and storage of the waste
proceeding from the educational, administrative and operational areas are the
responsibility of the Sodexho Company, which in 2008 had 209 employees, and in
the year of 2010, 220 employees, distributed in three shifts (mornings, afternoons
and evenings).
|
|||||||||||||
|