Título: REAL OPTION THEORY: AN APPROACH TO WIND POWER
Autor: CAROLINE DA SILVA PANTOJA
Colaborador(es): JOSE PAULO TEIXEIRA - Orientador
Catalogação: 25/ABR/2014 Língua(s): PORTUGUESE - BRAZIL
Tipo: TEXT Subtipo: THESIS
Notas: [pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio.
[en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio.
Referência(s): [pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=22854&idi=1
[en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=22854&idi=2
DOI: https://doi.org/10.17771/PUCRio.acad.22854
Resumo:
The Brazilian Electric Power Industry (SEB) has been going through many changes. The reform begun in 1993 resulted in a modification on characteristics of this sector that was mainly controlled by the government until that time. The changes in SEB occurred in 2003 and 2004 resulted in the creation of the Regulated Contracting Environment (ACR) and the Free Contracting Environment (ACL). Recently, new modifications happened in this sector with the law number 12.783/13, which regulates the Renovation of Concessions in the sector. In this context, it can be highlighted the wind power projects and their increasing participation in Brazilian electricity generation matrix. The Brazilian electricity generation matrix is still concentrated in hydroelectrical generation. However, wind power plants have been standing out in the last auctions, with more competitive prices than Small Hydro Power (PCH) and biomass projects. Therefore, considering the increasing importance of wind power source, this work proposes the application of an investment model under uncertainty for evaluating a wind power plant using the Real Option Theory. The flexibility used in this work refers to the choice of the mechanism for selling the generated energy. In this sense, it was assumed that the amount of generated energy which wouldn’t be contracted in the ACR could have the possibility of being negotiated in contracts in the ACL or it would be sold in the short-term market through the Differences Settlement Price (PLD). Results indicate an increase in the project value with the inclusion of this flexibility.