Logo PUC-Rio Logo Maxwell
ETDs @PUC-Rio
Estatística
Título: CONSTRUCTION WORKS MONITORING USING A GIS: THE TRAMWAY CONSTRUCTION IN RIO DE JANEIRO
Autor: MARIA FERNANDA NUNES SLADE
Colaborador(es): JOSE EUGENIO LEAL - Orientador
Catalogação: 09/AGO/2017 Língua(s): PORTUGUESE - BRAZIL
Tipo: TEXT Subtipo: THESIS
Notas: [pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio.
[en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio.
Referência(s): [pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=30902&idi=1
[en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=30902&idi=2
DOI: https://doi.org/10.17771/PUCRio.acad.30902
Resumo:
The increasing urbanization has generated large and medium cities, which without proper urban planning, face daily problems. Among these problems can be detach those linked to mobility, which shows that the current circulation model is expensive and impactful. Becomes evident the need to rethink the urban mobility, encouraging the use and evolution of quality and sustainable means of transportation, thus contributing to the cities development and to the population life quality. An option to improve the mobility is the tramway that operates by electricity force, induces urban renewal, and attracts other collective transportation modes and individual transportation users, thus contributing to a more sustainable and inclusive urban mobility implantation. In this way, in 2014 was started the tramway implantation project in the central zone of Rio de Janeiro, and in this work it is presented a construction work monitoring tool created and used in your execution. After the tool analyses it is possible to conclude that this model served its purposes, mainly in the planning stage, presenting a way to measure the construction progress easy to understand, with wide reach between the project managers and online, construction industry growing needs. Therefore, this study demonstrate itself current, when try to develop a tool that meets a construction industry demand, and innovative since few studies in this theme were realized in the tramway construction.
Descrição: Arquivo:   
COMPLETE PDF