Título: | THE DYNAMICS IN A LARGE SCALE TECHNOLOGY PROJECT | ||||||||||||||||||||||||||||||||||||||||
Autor: |
FABIANO SANNINO |
||||||||||||||||||||||||||||||||||||||||
Colaborador(es): |
SILVIO HAMACHER - Orientador |
||||||||||||||||||||||||||||||||||||||||
Catalogação: | 24/JUL/2006 | Língua(s): | PORTUGUESE - BRAZIL |
||||||||||||||||||||||||||||||||||||||
Tipo: | TEXT | Subtipo: | THESIS | ||||||||||||||||||||||||||||||||||||||
Notas: |
[pt] Todos os dados constantes dos documentos são de inteira responsabilidade de seus autores. Os dados utilizados nas descrições dos documentos estão em conformidade com os sistemas da administração da PUC-Rio. [en] All data contained in the documents are the sole responsibility of the authors. The data used in the descriptions of the documents are in conformity with the systems of the administration of PUC-Rio. |
||||||||||||||||||||||||||||||||||||||||
Referência(s): |
[pt] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=8726&idi=1 [en] https://www.maxwell.vrac.puc-rio.br/projetosEspeciais/ETDs/consultas/conteudo.php?strSecao=resultado&nrSeq=8726&idi=2 |
||||||||||||||||||||||||||||||||||||||||
DOI: | https://doi.org/10.17771/PUCRio.acad.8726 | ||||||||||||||||||||||||||||||||||||||||
Resumo: | |||||||||||||||||||||||||||||||||||||||||
This work presents a study of the System Dynamic as a
support tool for
decisions of the project leadership, demonstrating its use
and application in a
large-scale technology implementation project. Its
objective is to make possible
for the project management to have an analysis tool that
provides the anticipation
of the projects existent interferences, such as the need
of additional resources,
project decisions failures, scope changes, requests for
additional activities not
directly related to the project. The dynamic analysis
requires the manipulation of
many variables and needs a tool that supports the project
leadership in their vision
and better understanding of the overall project. With the
proposed technique,
project leadership, decision makers and managers in
general can analyze the
variables of a process and their dependencies. First, the
work describes the theory
related to System Dynamic, presenting a brief technique
history and conceptual
information. After that, it explains about Enterprise
Resource Planning (ERP)
implementation projects, their main characteristics,
conceptual models, phases,
main products and the required organizational structure.
Afterwards, it introduces
the main project management hard (formal) and soft
(causal) models, applying the
system dynamic based on the ERP implementation concepts
and demonstrating
the existing influences.
|
|||||||||||||||||||||||||||||||||||||||||
|