Título
[pt] MODELAGEM, SIMULAÇÃO E ANÁLISE TECNICO-ECONÔMICA PRELIMINAR DE UMA CÉLULA A COMBUSTÍVEL DE ÓXIDO SÓLIDO ALIMENTADA POR HIDROGÊNIO VERDE
Título
[en] MODELING, SIMULATION, AND PRELIMINARY TECHNO-ECONOMIC ANALYSIS OF A SOLID OXIDE FUEL CELL POWERED BY GREEN HYDROGEN
Autor
[pt] PEDRO CHATACK DIAS
Vocabulário
[pt] ANALISE ECONOMICA
Vocabulário
[pt] SIMULACAO DE PROCESSOS
Vocabulário
[pt] ELETROLISE ALCALINA NA AGUA
Vocabulário
[pt] CELULA A COMBUSTIVEL DE OXIDO SOLIDO
Vocabulário
[pt] ASPEN PLUS
Vocabulário
[pt] HIDROGENIO VERDE
Vocabulário
[en] ECONOMIC ANALYSIS
Vocabulário
[en] PROCESS SIMULATION
Vocabulário
[en] ALKALINE WATER ALECTROLYSIS
Vocabulário
[en] SOLID OXID FUEL CELL
Vocabulário
[en] ASPEN PLUS
Vocabulário
[en] GREEN HYDROGEN
Resumo
[pt] O aumento contínuo da demanda energética global, impulsionado pelo
crescimento populacional, industrialização e melhoria do padrão de vida, tem
acentuado os impactos ambientais associados à geração de energia. Nesse contexto,
tecnologias limpas e eficientes, como as células a combustível (CaC), ganham
destaque. Este trabalho visou o desenvolvimento de modelagem e simulação de
uma planta de geração e armazenamento de energia baseada em uma célula a
combustível de óxido sólido (SOFC) alimentada por hidrogênio verde, produzido
via eletrólise alcalina da água (AWE). As simulações foram realizadas nos
softwares Aspen Plus e Microsoft Excel, com validação por meio da comparação
com dados da literatura. Foram projetadas e avaliadas uma planta piloto, que teve
como base a Planta de Hidrogênio Verde da Eletrobrás localizada na UHE de
Itumbiara (Goiás), e uma hipotética planta industrial. Em ambas as plantas, foi
considerada a operação da AWE a 75 graus C e 30 bar e da SOFC a 750 graus C e 1 bar. Na
planta piloto, observou-se uma eficiência elétrica de 39,6 por cento e térmica de 45,4 por cento,
com geração de 3,6 kWh a partir de 15,13 kWh de energia na eletrólise e
alimentação de 2,61 L/h de água. Na planta industrial, para geração de 3,6 MWh,
são requeridos 55,2 MWh e 9,53 m cúbicos/h de água. A análise econômica preliminar foi
conduzida apenas para a planta industrial e em um horizonte de 20 anos, ela apontou
um CAPEX de 302,7 milhões de reais, OPEX de R$ 8,49 milhões/ano e receitas anuais
de 23,3 milhões de reais. A análise de rentabilidade da planta industrial indicou um
investimento promissor, com VPL de 108,2 milhões de reais, ROI de 11,70 por cento e LCOE
inferior ao custo da rede elétrica (0,60 centavos/kWh). No entanto, o longo Payback (16
anos e 3 meses) e a TIR de apenas 3 por cento apontam que o projeto ainda pode ser
otimizado, já que o retorno atual é inferior ao custo de oportunidade do capital.
Resumo
[en] The continuous increase in global energy demand, driven by population growth, industrialization, and improved living standards, has intensified the environmental impacts associated with energy generation. In this context, clean and efficient technologies, such as fuel cells (FC), have gained prominence. This work aimed to develop the modeling and simulation of an energy generation and storage plant based on a solid oxide fuel cell (SOFC) powered by green hydrogen, produced via alkaline water electrolysis (AWE). The simulations were performed using Aspen Plus and Microsoft Excel, with validation through comparison with data from the literature. A pilot plant, based on Eletrobrás’s Green Hydrogen Plant located at the Itumbiara Hydropower Plant (Goiás, Brazil), and a hypothetical industrial-scale plant were designed and evaluated. In both cases, the AWE was considered to operate at 75 degrees C and 30 bar, while the SOFC operated at 750 degrees C and 1 bar. In the pilot plant, an electrical efficiency of 39.6 percent and a thermal efficiency of 45.4 percent were observed, with a net electricity generation of 3.6 kWh from 15.13 kWh of electrolysis input energy and a water feed of 2.61 L/h. In the industrial plant, to generate 3.6 MWh, 55.2 MWh and 9.53 m cubic/h of water were required. The preliminary economic analysis was conducted only for the industrial-scale plant, considering a 20-year horizon. The results indicated a CAPEX of 302.7 millions of reais, OPEX of 8.49 millions of reais/year, and annual revenues of 23.3 millions of reais. The profitability analysis showed a promising investment, with an NPV of 108.2 millions of reais, ROI of 11.70 percent, and an LCOE lower than the grid electricity cost (0.60 cents/kWh). However, the long payback period (16 years and 3 months) and the IRR of only 3 percent suggest that the project still requires optimization, since the current return is lower than the capital opportunity cost.
Orientador(es)
BRUNNO FERREIRA DOS SANTOS
Coorientador(es)
ROBERTO BENTES DE CARVALHO
Banca
ROBERTO BENTES DE CARVALHO
Banca
BRUNNO FERREIRA DOS SANTOS
Banca
JORGE ANTONIO AVENDANO BENAVIDES
Banca
HUGO VALENCA DE ARAUJO
Catalogação
2026-03-10
Apresentação
2025-09-26
Tipo
[pt] TEXTO
Formato
application/pdf
Idioma(s)
PORTUGUÊS
Referência [pt]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=75602@1
Referência [en]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=75602@2
Referência DOI
https://doi.org/10.17771/PUCRio.acad.75602
Arquivos do conteúdo
NA ÍNTEGRA PDF