Maxwell Para Simples Indexação

Título
[en] OPTIMIZATION OF TRANSFORMER AND MOBILE SUBSTATION STOCKS IN POWER SYSTEMS VIA MONTE CARLO SIMULATION AND GENETIC ALGORITHM

Título
[pt] OTIMIZAÇÃO DE ESTOQUES DE TRANSFORMADORES E SUBESTAÇÕES MÓVEIS EM SISTEMAS DE POTÊNCIA VIA SIMULAÇÃO MONTE CARLO E ALGORITMO GENÉTICO

Autor
[pt] VENUS LIRIA SILVA MENDES

Vocabulário
[pt] ALGORITMO GENETICO

Vocabulário
[pt] AVALIACAO DA CONFIABILIDADE

Vocabulário
[pt] SUBESTACAO MOVEL

Vocabulário
[pt] SUBESTACAO DE DISTRIBUICAO

Vocabulário
[pt] DIMENSIONAMENTO DE ESTOQUE DE TRANSFORMADORES

Vocabulário
[pt] SIMULACAO MONTE CARLO

Vocabulário
[en] GENETIC ALGORITHM

Vocabulário
[en] RELIABILITY ASSESSMENT

Vocabulário
[en] MOBILE SUBSTATION

Vocabulário
[en] DISTRIBUTION SUBSTATION

Vocabulário
[en] SIZING OF SPARE TRANSFORMERS

Vocabulário
[en] MONTE CARLO SIMULATION

Resumo
[pt] Em geral, as subestações são projetadas com transformadores em paralelo, operando a meia carga, para assegurar continuidade no fornecimento de energia mesmo que um transformador do grupo falhe. Contudo, essa prática implica em custos elevados, especialmente no que diz respeito ao arranjo de subestações. Uma solução alternativa é a utilização de estoques compartilhados de transformadores reservas e unidades de subestações móveis, que devem atender a um grupo de subestações com as mesmas características elétricas. Neste contexto, esta tese propõe a utilização temporária de unidades de subestações móveis, que devem atuar para atender à demanda de energia enquanto o transformador reserva é instalado. Essa estratégia aumenta a confiabilidade do sistema e reduz os custos operacionais e de investimento para as concessionárias de energia. No entanto, o sucesso dessa abordagem está intrinsecamente ligado ao dimensionamento e localização adequada dos estoques. Para que bons resultados sejam alcançados, é preciso dimensionar os estoques de forma que não haja investimento desnecessário ou um número insuficiente de equipamentos, e considerar pontos estratégicos de armazenamento, de forma que o tempo de deslocamento dos equipamentos sobressalentes até o ponto de falha garanta a minimização dos custos associados. Posto isso, esta tese apresenta duas metodologias de otimização baseadas em simulação Monte Carlo e Algoritmo Genético: uma para dimensionar o número de transformadores reservas e unidades de subestações móveis por ano; e outra para posicionar de forma adequada tais equipamentos em subestações com capacidade de armazenamento. Ambos os métodos foram aplicados a um grupo de transformadores de duas concessionárias reais, visando demonstrar a capacidade da metodologia de encontrar um conjunto de soluções factíveis do ponto de vista técnico e econômico.

Resumo
[en] In general, substations are designed with transformers in parallel, operating at half load, to ensure continuity of power supply even if a transformer in the group fails. However, this practice involves high costs, especially with regard to the arrangement of substations. An alternative solution is the use of shared stocks of reserve transformers and mobile substation units, which must serve a group of substations with the same electrical characteristics. In this context, this thesis proposes the temporary use of mobile substation units, which must act to meet the energy demand while the reserve transformer is installed. This strategy increases system reliability and reduces operational and investment costs for electric utilities. However, the success of this approach is intrinsically linked to the proper sizing and location of stocks. For good results to be achieved, it is necessary to size stocks so that there is no unnecessary investment or an insufficient number of equipment, and consider strategic storage points, so that the time taken to move the spare equipment to the point of failure minimizes the associated costs. Thus, this thesis presents two optimization methodologies based on Monte Carlo simulation and Genetic Algorithm: one to size the number of spare transformers and mobile substation units per year; and another to properly locate such equipment in substations with storage capacity. Both methods were applied to a group of transformers from two real utilities, aiming at proving the method s ability to find a set of feasible solutions from a technical and economic point of view.

Orientador(es)
ARMANDO MARTINS LEITE DA SILVA

Coorientador(es)
JOAO GUILHERME DE CARVALHO COSTA

Banca
ARMANDO MARTINS LEITE DA SILVA

Banca
JOSÉ FILHO DA COSTA CASTRO

Banca
JOAO GUILHERME DE CARVALHO COSTA

Banca
FERNANDO APARECIDO DE ASSIS

Banca
MAURO AUGUSTO DA ROSA

Catalogação
2024-09-12

Apresentação
2024-04-25

Tipo
[pt] TEXTO

Formato
application/pdf

Idioma(s)
PORTUGUÊS

Referência [pt]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=67985@1

Referência [en]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=67985@2

Referência DOI
https://doi.org/10.17771/PUCRio.acad.67985


Arquivos do conteúdo
NA ÍNTEGRA PDF