Maxwell Para Simples Indexação

Título
[en] ANALYSIS OF THE INSTRUMENTATION OF THE MILAGRES TUNNEL, AN INTEGRAL PART OF THE TRANSPOSITION OF THE SÃO FRANCISCO RIVER

Título
[pt] ANÁLISE DA INSTRUMENTAÇÃO DO TÚNEL MILAGRES, OBRA INTEGRANTE DA TRANSPOSIÇÃO DO RIO SÃO FRANCISCO

Autor
[pt] LEONARDO DE ALMEIDA FERREIRA

Vocabulário
[pt] RECALQUE

Vocabulário
[pt] INSTRUMENTACAO DE TUNEIS

Vocabulário
[pt] TUNEL MILAGRES

Vocabulário
[pt] RIO SAO FRANCISCO

Vocabulário
[pt] CONVERGENCIA

Vocabulário
[pt] TRANSPOSICAO

Vocabulário
[en] SETTLEMENT

Vocabulário
[en] TUNNEL INSTRUMENTATION

Vocabulário
[en] MILAGRES TUNNEL

Vocabulário
[en] SAO FRANCISCO RIVER

Vocabulário
[en] CONVERGENCE

Vocabulário
[en] TRANSPOSITION

Resumo
[pt] Esta dissertação apresenta um resumo geral sobre as obras de construção do Túnel Milagres, escavado em rocha (filito), com extensão de 818 metros, entre os municípios de Salgueiro (PE) e Penaforte (CE). Este túnel faz parte do Projeto de Integração do São Francisco (PISF), em execução desde 2007, e com inauguração prevista para 2021. O trabalho aborda brevemente os métodos de classificação de maciços rochosos, os métodos de escavação de túneis e a importância da instrumentação geotécnica na execução desta obra. São estudadas seis seções instrumentadas da escavação do Túnel Milagres, avaliando-se os deslocamentos medidos por meio das convergências e os recalques. Observou-se que as medições de convergência e de recalque estão interligadas. Verificou-se, ainda, a estabilização das seções monitoradas após 60 dias.

Resumo
[en] This dissertation presents a general summary on the excavation works of the Milagres Tunnel, excavated in rock (Phyllite), with an extension of 818 meters, between the municipalities of Salgueiro (PE) and Penaforte (CE). This tunnel is part of the São Francisco Transposition Project (PISF), under construction since 2007, and planned to be inaugurated in 2021. This work briefly addresses the classification methods of rocky masses, the tunneling excavation methods of and the importance of geotechnical instrumentation on this project. Six instrumented sections of the excavation of the Milagres Tunnel are evaluated, focusing at the measured values of convergence and displacements. It is observed that convergence and settlement measurements are interconnected. stabilization of the monitored sections was observed after 60 days has been noted.

Orientador(es)
ALBERTO DE SAMPAIO FERRAZ JARDIM SAYAO

Coorientador(es)
ANNA LAURA LOPES DA SILVA NUNES

Banca
ALBERTO DE SAMPAIO FERRAZ JARDIM SAYAO

Banca
JOSE TAVARES ARARUNA JUNIOR

Banca
ANNA LAURA LOPES DA SILVA NUNES

Banca
SANDRO SALVADOR SANDRONI

Banca
ANA CRISTINA CASTRO FONTENLA SIEIRA

Catalogação
2020-06-05

Apresentação
2020-03-02

Tipo
[pt] TEXTO

Formato
application/pdf

Idioma(s)
PORTUGUÊS

Referência [pt]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=48468@1

Referência [en]
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=48468@2

Referência DOI
https://doi.org/10.17771/PUCRio.acad.48468


Arquivos do conteúdo
NA ÍNTEGRA PDF